The Massachusetts Port Authority (Massport) today announced that as part of Logan Airport’s annual maintenance and construction program, an extended runway closure to resurface Runway 4R will begin on Monday, September 5th at 10 am and conclude on Monday, September 12th at 7 am. Massport has scheduled the closure in anticipation of a lengthy period of favorable weather conditions. Massport annually engages in regular maintenance of Logan’s airfield to ensure runways and taxiways are safe and operational in all weather conditions.
During the closure, and depending on wind and weather conditions, other runway configurations will be used to accommodate operations at Logan. As a result, residents from neighboring communities may experience an increase or decrease in the number of overflights during the project. All project activities will take place on Logan’s airfield and construction vehicles will use designated highway routes
For information on specific changes in runway usage, please call Massport’s Noise Complaint Line at 617-561-3333 during Noise Abatement Office hours of M-F 6:00 am to 6:00 pm. The Noise Complaint Line will continue to be available to receive noise complaints 24 hours per day, seven days per week. For general information on these projects, please call Massports Office of Government and Community Affairs at 617-568-3711 (M-F 9:00 AM to 5:00 PM).