There will be alternating lane closures TODAY from 1:00 p.m. to 3:00 p.m. on the Upper Level of the Tobin Bridge to secure painting equipment. At times traffic may be reduced to one lane.
In
There will be alternating lane closures TODAY from 1:00 p.m. to 3:00 p.m. on the Upper Level of the Tobin Bridge to secure painting equipment. At times traffic may be reduced to one lane.
In
Continental Airlines will move to Terminal A, Boston Logan International Airport's newest and greenest terminal, starting Nov. 11, 2007.
"Massport is pleased that the more than one million passengers
I-90 Eastbound at Logan Airport will be closed weeknights starting Friday November 2, through Friday November 9 from 10:00 p.m. through 5:00 a.m. All traffic will be detoured at I-90 exit 26 and
Continental Airlines will move to Terminal A, Boston Logan International Airport's newest and greenest terminal, starting Nov. 11, 2007.
"Massport is pleased that the more than one million passengers
I-90 Eastbound at Logan Airport will be closed weeknights starting Friday November 2, through Friday November 9 from 10:00 p.m. through 5:00 a.m. All traffic will be detoured at I-90 exit 26 and
Starting Monday Nov. 5 and continuing through Tuesday, Nov. 13, there will be alternating and periodic double lane restrictions on the Upper Level from 7 p.m. to 5 a.m. for Jersey barrier removal and
There will be alternating lane closures TODAY from 1:00 p.m. to 3:00 p.m. on the Upper Level of the Tobin Bridge to secure painting equipment. At times traffic may be reduced to one lane.
In
A simulated runway collision this morning involving two passenger aircraft at Boston Logan International Airport kicked off the world's largest airport-based mass casualty exercise.
Some 400
A simulated runway collision this morning involving two passenger aircraft at Boston Logan International Airport kicked off the world's largest airport-based mass casualty exercise.
Some 400
Bridge to Close for Repairs
Please be advised that the Chelsea Street Bridge is scheduled to close for repairs beginning at 6:00 a.m. on Sunday, October 21, 2007 through 4:00 a.m. Monday, October 22.
Bridge to Close for Repairs
Please be advised that the Chelsea Street Bridge is scheduled to close for repairs beginning at 6:00 a.m. on Sunday, October 21, 2007 through 4:00 a.m. Monday, October 22.
The Ted Williams Tunnel westbound will be closed weeknights from 11:30 p.m. to 5 a.m. the following morning. One lane of the tunnel will also be closed at 9 p.m. Monday through Friday.
This closure
The Ted Williams Tunnel westbound will be closed weeknights from 11:30 p.m. to 5 a.m. the following morning. One lane of the tunnel will also be closed at 9 p.m. Monday through Friday.
This closure
As part of Massport's in depth inspection of the Tobin Bridge, conducted every four years, this afternoon, we discovered a crack on a transverse cross floor beam on the upper level of the bridge. It
As part of Massport's in depth inspection of the Tobin Bridge, conducted every four years, this afternoon, we discovered a crack on a transverse cross floor beam on the upper level of the bridge. It