Massport has introduced online bidding for all C.149 and C.30 projects and Consultant Professional Services.
Online Bidding Project Information
Bid Express New Vendor Instructions
All new bids for C.149 and C.30 projects Consultant Professional Services can be found on the Massport Bid Express website. The construction projects listed below under Advertised Contracts that are C.149 or C.30 have already been advertised. No hard copies of the bidding information, Proposal, Plans and Specifications, Addenda, or other material is available. Nor will Massport accept hard copy bids for these projects. Bidding on these projects is completely online.
All bidders need to be registered with Bid Express to submit or respond to Bids. Please refer to the new Bid Express New Vendor Instructions.
Project # | Opportunity Type | Project Title | Due Date | Estimate |
---|---|---|---|---|
M687 | Professional Consultant - Bid Express | MAINTENANCE DREDGING CONSULTING SERVICES, FLYNN CRUISEPORT BOSTON AND MASSPORT FIRE DOCK, SOUTH BOSTON AND EAST BOSTON, MASSACHUSETTS | 11/9/2023 | $750,000 |
L1697
(BidExpress)
|
Construction Manager at Risk | TERMINAL B ROADWAY AND GARAGE OPTIMIZATION | 11/2/2023 | $35,000,000 |
L1740-C1R General
(BidExpress)
|
Construction 149/30 | LOC CRAC UNIT REPLACEMENT, ONE HARBORSIDE DRIVE, BOSTON, MASSACHUSETTS | 10/25/2023 | $5,500,000 |
W316-C1
(BidExpress)
|
Construction 149/30 | OVERFLOW PARKING LOT, WORCESTER REGIONAL AIRPORT, WORCESTER, MASSACHUSETTS | 10/18/2023 | $1,000,000 |
A288-C11
(BidExpress)
|
Construction 149/30 | INTERIOR & EXTERIOR SIGNAGE - TERM CONTRACT, ALL MASSPORT PROPERTIES, BEDFORD, BOSTON, BRAINTREE, FRAMINGHAM, PEABODY, WOBURN, AND WORCESTER MASSACHUSETTS | 10/18/2023 | $1,500,000 |
L1740-C1R SUB
(BidExpress)
|
Construction 149/30 | LOC CRAC UNIT REPLACEMENT, ONE HARBORSIDE DRIVE, BOSTON, MASSACHUSETTS | 10/11/2023 | $5,500,000 |
M549-C1
(BidExpress)
|
Construction 149/30 | CONLEY TERMINAL STORAGE – PHASE 1, CONLEY TERMINAL, SOUTH BOSTON, MASSACHUSETTS | 10/11/2023 | $4,300,000 |
AP2408-C1
(BidExpress)
|
Construction 149/30 | AUTHORITY WIDE TERM WELDING & METAL FABRICATION, BOSTON – NON BUILDING, BEDFORD, WORCESTER, MASSACHUSETTS | 10/11/2023 | $750,000 |
L1638-C1
(BidExpress)
|
Construction 149/30 | SITE PREPARTION FOR CNG FUELING STATION RELOCATION, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 9/27/2023 | $1,500,000 |
W306 | Professional Consultant - Bid Express | FEDERALLY FUNDED AIRFIELD CAPITAL IMPROVEMENT PROJECTS – DESIGN AND CONSTRUCTION PHASE SERVICES, WORCESTER REGIONAL AIRPORT, WORCESTER, MASSACHUSETTS | 9/21/2023 | $1,500,000 |
AP2406 | Professional Consultant - Bid Express | AP2406 TERM STORMWATER PERMIT COMPLIANCE AND POTABLE WATER CONSULTANT SERVICES | 9/21/2023 | $3,000,000 |
M658-C1
(BidExpress)
|
Construction 149/30 | STRUCTURAL REPAIRS, BOSTON FISH PIER, SOUTH BOSTON, MA | 9/20/2023 | $171,000 |
L1366-D2 | Professional Consultant - Bid Express | NORTH SERVICE AREA GREEN BUS DEPOT REPURPOSING, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 9/14/2023 | $15,000,000 |
L1697-C2 GENERAL
(BidExpress)
|
Construction 149/30 | TERMINAL B ROADWAY AND GARAGE OPTIMIZATION - RIDE APP PHASE II, LOGAN INTERNATIONAL AIRPORT | 9/13/2023 | $1,200,000 |
AP2404-C1
(BidExpress)
|
Construction 149/30 | PUMP & MOTOR SERVICE AND MAINTENANCE TERM CONTRACT, BOSTON, BEDFORD, MASSACHUSETTS | 9/13/2023 | $375,000 |
AP2405-C1
(BidExpress)
|
Construction 149/30 | HIGH VOLTAGE ELECTRICAL MAINTENANCE TERM CONTRACT, ALL MASSPORT LOCATIONS, BEDFORD, BOSTON, FRAMINGHAM, PEABODY, WOBURN, AND WORCESTER, MASSACHUSETTS | 9/6/2023 | $2,880,000 |
L1697-C2 SUB
(BidExpress)
|
Construction 149/30 | TERMINAL B ROADWAY AND GARAGE OPTIMIZATION - RIDE APP PHASE II, LOGAN INTERNATIONAL AIRPORT | 8/30/2023 | $1,200,000 |
M658-C2
(BidExpress)
|
Construction 149/30 | General Contractor: BOSTON FISH PIER DOOR REHABILITATION, 212 NORTHERN AVENUE, BOSTON, MASSACHUSETTS | 8/23/2023 | $900,000 |
M734 | Professional Consultant - Bid Express | M734 – SUSTAINABLE VEHICLE AND EQUIPMENT FUELING INFRASTRUCTURE - CONLEY TERMINAL, CRUISE TERMINAL, FISH PIER AND EAST BOSTON PARK MAINTENANCE FACILITIES, SOUTH AND EAST BOSTON, MASSACHUSETTS | 8/17/2023 | $2,000,000 |
L1694-C3
(BidExpress)
|
Construction 149/30 | General Contractor: PARTIAL ROOF REPLACEMENT AND ASSOCIATED WORK AT TERMINAL B, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 8/16/2023 | $934,600 |
AP2403-C1
(BidExpress)
|
Construction 149/30 | ENGINE MAINTENANCE AND REPAIRS FOR GENERATORS, ALL MASSPORT PROPERTIES, BOSTON, BEDFORD, FRAMINGHAM, AND WORCESTER, MASSACHUSETTS | 8/16/2023 | $1,315,400 |
L1824 | Professional Consultant | GSE Maintenance Building | 8/10/2023 | $2,000,000 |
L1694-C3
(BidExpress)
|
Construction 149/30 | Filed Sub BIds: PARTIAL ROOF REPLACEMENT AND ASSOCIATED WORK AT TERMINAL B, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 8/9/2023 | $934,600 |
M658-C2 SUB
(BidExpress)
|
Construction 149/30 | Filed Sub BIds: BOSTON FISH PIER DOOR REHABILITATION, 212 NORTHERN AVENUE, BOSTON, MASSACHUSETTS | 8/9/2023 | $900,000 |
A446 | Professional Consultant - Bid Express | TERM SIGNAGE DESIGN SERVICES | 7/27/2023 | $1,000,000 |
M707-C1
(BidExpress)
|
Construction 149/30 | General: SOUTH BOSTON WATERFRONT TRANSPORTATION CENTER SIGNAGE IMPROVEMENTS, 503 CONGRESS STREET, BOSTON, MASSACHUSETTS 02210 | 7/26/2023 | $1,300,000 |
M705-C1
(BidExpress)
|
Construction 149/30 | ROOF REPLACEMENT AND ASSOCIATED WORK AT MPA FISH PIER EAST, BOSTON FISH PIER, 212 NORTHERN AVENUE, SOUTH BOSTON, MASSACHUSETTS | 7/19/2023 | $3,555,200 |
L1828 | Professional Consultant - Bid Express | 2023 Airfield Capital Improvement Projects | 7/13/2023 | $2,000,000 |
M707-C1
(BidExpress)
|
Construction 149/30 | SUB BIDS: SOUTH BOSTON WATERFRONT TRANSPORTATION CENTER SIGNAGE IMPROVEMENTS, 503 CONGRESS STREET, BOSTON, MASSACHUSETTS 02210 | 7/12/2023 | $1,300,000 |
HP2400-C1
(BidExpress)
|
Construction 149/30 | INSTALLATION OF PLANTINGS AND ASSOCIATED PROTECTIVE FENCING JORDAN CONSERVATION AREA (JCA), L.G. HANSCOM FIELD | 7/12/2023 | $80,000 |
M689-C1
(BidExpress)
|
Construction 149/30 | BERTH 12 PAVEMENT REHABILITATION, CONLEY TERMINAL, SOUTH BOSTON, MASSACHUSETTS | 7/12/2023 | $5,260,000 |
M483-C1
(BidExpress)
|
Construction 149/30 | CYPHER & E STREET RECONSTRUCTION, BOSTON MASSACHUSETTS | 6/28/2023 | $23,900,000 |
A447 | Professional Consultant - Bid Express | Term Roofing and Building Envelope Consulting Services | 6/22/2023 | $2,000,000 |
M711 | Professional Consultant | Hoosac Pier Bulkhead Rehabilitation | 6/8/2023 | $2,000,000 |
AP2401-C1
(BidExpress)
|
Construction 149/30 | SELECT HYDRANT & GATE VALVE REPLACEMENT TERM CONTRACT, BEDFORD, BOSTON & WORCESTER, MASSACHUSETTS | 6/7/2023 | $675,000 |
AP2402-C1
(BidExpress)
|
Construction 149/30 | FY24-26 WATERFRONT REPAIR TERM CONTRACT, BOSTON, MASSACHUSETTS | 5/31/2023 | $1,225,000 |
A443 | Professional Consultant | Third Party Commissioning Consulting Services FY23-25, All Massport Owned and Operated Facilities | 5/26/2023 | $1,000,000 |
AP2302-C1
(BidExpress)
|
Construction 149/30 | TERM INTERIOR BUILDING REPAIRS, BOSTON, BEDFORD, AND WORCESTER MASSACHUSETTS | 5/24/2023 | $2,000,000 |
AP2305-C1
(BidExpress)
|
Construction 149/30 | TERM CAULKING/SEALANT REPAIRS, BOSTON, BEDFORD, BRAINTREE, CHELSEA, FRAMINGHAM, PEABODY, WORCESTER AND WOBURN, MASSACHUSETTS | 5/3/2023 | $1,500,000 |
L1802 | Professional Consultant | PRESCOTT STREET BUILDING FIT-OUT, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 4/20/2023 | $1,000,000 |
L1738-C1
(BidExpress)
|
Construction 149/30 | ENERGY OPTIMIZATION PROGRAM – LOGAN AIRSIDE CHARGING STATIONS, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 4/19/2023 | $4,300,000 |
LP2301 | Contractor/Vendor RFQ | FY24-27 Passenger Boarding Bridges and Baggage Handling System | 4/12/2023 | $21,000,000 |
L1740-C1
(BidExpress)
|
Construction 149/30 | LOC CRAC UNIT REPLACEMENT, ONE HARBORSIDE DRIVE, BOSTON, MASSACHUSETTS | 3/29/2023 | $4,600,000 |
L1709-C1
(BidExpress)
|
Construction 149/30 | MISCELLANEOUS AIRFIELD PAVEMENT IMPROVEMENTS, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 3/22/2023 | $3,400,000 |
W308-C1
(BidExpress)
|
Construction 149/30 | RUNWAY 29 REHABILITATION (APPROXIMATELY 3720’ x 150’), WORCESTER, MASSACHUSETTS | 3/22/2023 | $11,100,000 |
AP2209-C1
(BidExpress)
|
Construction 149/30 | FY2023-2026 TERM CONTRACT FOR ON-CALL AND EMERGENCY ENVIRONMENTAL SERVICES AND MAINTENANCE SERVICES, ALL MASSACHUSETTS PORT AUTHORITY FACILITIES, BOSTON, BEDFORD, CHELSEA, FRAMINGHAM, AND WORCESTER, MASSACHUSETTS | 3/8/2023 | $2,900,000 |
H288-C1
(BidExpress)
|
Construction 149/30 | RUNWAY 5-23 (SOUTH OF RW 11-29) REHAB, LIGHTING AND TW E GEOMETRY IMPROVEMENTS, LAURENCE G. HANSCOM FIELD, BEDFORD, MASSACHUSETTS | 3/8/2023 | $8,000,000 |
MP2301-C1
(BidExpress)
|
Construction 149/30 | MARITIME PAVEMENT REPAIRS - TERM CONTRACT, MASSACHUSETTS PORT AUTHORITY FACILITIES, SOUTH BOSTON, MA | 3/8/2023 | $2,500,000 |
AP2304-C1R
(BidExpress)
|
Construction 149/30 | TERM DOOR REPLACEMENT, BOSTON, BEDFORD AND WORCESTER, MASSACHUSETTS | 2/22/2023 | $500,000 |
L1694-C2
(BidExpress)
|
Construction 149/30 | ROOF REPLACEMENT AND ASSOCIATED WORK AT BUILDING 62, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 2/8/2023 | $2,580,000 |
L1645-C1
(BidExpress)
|
Construction 149/30 | REHABILITATE RUNWAY 15R-33L AND ASSOCIATED GEOMETRY IMPROVEMENTS, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON MASSACHUSETTS | 2/8/2023 | $62,000,000 |
M727-C1
(BidExpress)
|
Construction 149/30 | NEW CRUISE TERMINAL ESCALATOR, FLYNN CRUISEPORT BOSTON, 1 BLACK FALCON AVENUE, SOUTH BOSTON, MASSACHUSETTS | 2/1/2023 | $4,600,000 |
LP2300-C1
(BidExpress)
|
Construction 149/30 | NOTICE TO CONTRACTORS Electronic General Bids for MPA CONTRACT NO. LP2300-C1, FY2023-2025 RUNWAY/TAXIWAY SAFETY AREA INFIELD MAINTENANCE TERM CONTRACT, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 2/1/2023 | $1,000,000 |
AP2205-C1
(BidExpress)
|
Construction 149/30 | TERM MECHANICAL CONTRACT, ALL MASSPORT FACILITIES IN BEDFORD, BOSTON, BRAINTREE, FRAMINGHAM, PEABODY, WOBURN AND WORCESTER, MASSACHUSETTS | 1/25/2023 | $2,700,000 |
L1694-C2
(BidExpress)
|
Construction 149/30 | ROOF REPLACEMENT AND ASSOCIATED WORK AT BUILDING 62, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 1/25/2023 | $2,580,000 |
AP2304-C1
(BidExpress)
|
Construction 149/30 | TERM DOOR REPLACEMENT, BOSTON, BEDFORD AND WORCESTER, MASSACHUSETTS | 1/18/2023 | $500,000 |
M727-C1
(BidExpress)
|
Construction 149/30 | NEW CRUISE TERMINAL ESCALATOR, FLYNN CRUISEPORT BOSTON, 1 BLACK FALCON AVENUE, SOUTH BOSTON, MASSACHUSETTS | 1/18/2023 | $4,600,000 |
AP2205-C1
(BidExpress)
|
Construction 149/30 | TERM MECHANICAL CONTRACT, ALL MASSPORT FACILITIES IN BEDFORD, BOSTON, BRAINTREE, FRAMINGHAM, PEABODY, WOBURN AND WORCESTER, MASSACHUSETTS | 1/11/2023 | $2,700,000 |
AP2301-C1
(BidExpress)
|
Construction 149/30 | TERM ABATEMENT, MASSACHUSETTS | 12/21/2022 | $2,332,675 |
L1622-C2 (General Bid)
(BidExpress)
|
Construction 149/30 | Terminal A Pre Check Checkpoint- Phase 2 | 12/14/2022 | $1,800,000 |
L1622-C2
(BidExpress)
|
Construction 149/30 | L1622-C2 Terminal A Pre Check Checkpoint- Phase 2 ( SUB BIDS) | 12/9/2022 | $1,800,000 |
AP2207-C1
(BidExpress)
|
Construction 149/30 | LOW VOLTAGE ELECTRICAL MAINTENANCE TERM CONTRACT ALL MASSPORT PROPERTIES | 12/7/2022 | $3,000,000 |
L1758-C1
(BidExpress)
|
Construction 149/30 | LOGAN AIRPORT ROADWAYS REHABILITATION, LOGAN INTERNATIONAL AIRPORT | 11/16/2022 | $11,500,000 |
Project # | Opportunity Type | Project Title | Bid Date | Estimate |
---|---|---|---|---|
A445 | Professional Consultant | On-Call Geographic Information System Consulting Services | 5/25/2023 | $500,000 |
L1633 | Professional Consultant | Runway 27 Safety Area Improvements | 5/18/2023 | $5,000,000 |
M750 | Professional Consultant | FY23-27 Maritime Term Architecture/Engineering Services | 5/18/2023 | $2,000,000 |
AP2400 | Professional Consultant | Trust Agreement Engineer FY24-28 | 5/4/2023 | $7,000,000 |
L1809 | Professional Consultant | Terminal C Improvements | 5/4/2023 | $2,000,000 |
A398 | Professional Consultant | Construction Materials Testing & Inspections | 3/30/2023 | $1,000,000 |
L1761 | Professional Consultant | CHP STUDY TO ACHIEVE NET ZERO, BOSTON LOGAN INTERNATIONAL AIRPORT | 3/30/2023 | $2,000,000 |
L1757 | Professional Consultant | Terminal E Arrival Canopy and Curb Optimization | 3/2/2023 | $2,000,000 |
M702 | Professional Consultant | Shore Power, Flynn Cruiseport | 3/2/2023 | $1,000,000 |
A442-D1 | Professional Consultant | AUTHORITY-WIDE ELEVATOR, ESCALATOR AND MOVING WALKWAY PROGRAM, BOSTON, BEDFORD AND WORCESTER, MASSACHUSTTS | 1/26/2023 | $2,000,000 |
M549-D1 | Professional Consultant | TERMINAL CONTAINER STORAGE | 1/19/2023 | $2,000,000 |
A435 | Professional Consultant | FY23-FY27 TERM ENGINEERING (EA) SERVICES – TERM CONSULTANT | 1/12/2023 | $2,000,000 |