Capital Programs

» Capital Programs » L1255-D1
Terminal C Connectors
Contract: L1255-D1
Location: Logan Airport
Documents:
L1255-D1 (21k) updated Tuesday, November 20, 2012
L1255-D1 Term C Connectors Overview (977.7k) updated Wednesday, December 19, 2012
L1255-D1 KeyPlan (188.8k) updated Wednesday, December 19, 2012
L1255-D1 Sign In Sheet (1090.7k) updated Wednesday, December 19, 2012
Opportunity Type Professional
Advertised Date 11/20/2012
Bid Date
Sub Bid Date
Qualification Due 1/10/2013 12:00 PM
Qualification Location Capital Programs Dept, Logan Office Center, One Harborside Dr, Suite 209S E Boston MA
Pre-Bid Conference
12/12/2012
2:00 PM
Capital Programs Dept, Logan Office Center, One Harborside Dr, Suite 209S E Boston MA
Bid Opening
Sub Bid Opening
Bid Info Links
PlanHolders
Sub Bid Info
Scope of Work The Authority is seeking a qualified multidisciplinary consulting firm or team, with proven design experience to provide professional services including planning, design, resident engineering and construction related services relative to the design of post security concourses between Terminal C, Pier B and Terminal E and between Terminal C, Pier C and Terminal C, Pier D. The Consultant must be able to work closely with the Authority and other interested parties to provide such services in a timely and effective manner. Massport envisions an extensive collaboration at all phases of the project and between all project stakeholders. Elements of Lean Construction will be incorporated into the work and the project is anticipated to be procured under MGL Ch. 149A. The consultant shall demonstrate experience in disciplines including but not limited to Architectural, Civil, Airside planning, Structural, Mechanical, Electrical, Plumbing, Vertical Transportation, Geotechnical, Code Compliance, Environmental Permitting, Cost Estimating, Construction Phasing, and Sustainable Design. This project is an important component of Logan Airport’s long term planning goal to have all Terminals connected post security. The scope of work shall include, but not be limited to the following: program definition, preliminary design, final design, bid phase, construction phase, project controls and resident engineering. The scope of the project includes post security concourses between Terminal C, Pier B and Terminal E and between Terminal C, Pier C and Terminal C, Pier D. The program for the connectors may includes hold rooms, concessions, toilets and circulation concourses. Construction of the new work will impact existing ramp activity and it is essential that the work be designed and constructed in such a manner that all required airline operations will be maintained.
Contact CPBidQuestions@massport.com
Awarded To:
General Contractor
Contract Value  
Contract Awarded Date