| Pre-Bid Conference |
12/19/2012
11:00AM
Capital Programs, Logan Office Center, 2nd Fl, 1 Harborside Dr, E Boston MA 02128
|
| Bid Info Links |
PlanHolders
Sub Bid Info
Shortlisted
|
| Scope of Work |
The project includes a new secure concourse between Terminal B, Pier A and Pier B, and consists of 8 new holdrooms, 24 ticket counter positions, a renovated security checkpoint with additional passenger queuing and 4 additional lanes, concessions space, toilet rooms, airline operations space and vertical circulation.
In accordance with Massachusetts Construction Manager at-Risk requirements, MGL Chapter 149 Section 44F, Qualification Statements are being requested from trade contractors capable of performing the following classes of work: (a) miscellaneous & ornamental iron: (b) waterproofing, damproofing & caulking (c) glass and glazing (d) tile (e) acoustical ceilings (f) terrazzo (g) resilient flooring (h) painting (i) elevators (j) plumbing (k) HVAC (1) electrical.
The estimated cost of the Contract is $33,676,900 and the estimated construction duration is twelve (12) months. The estimated value of work to be performed by trade contractors is as follows:
• Miscellaneous & ornamental iron- $640,500
• Waterproofing, damproofing & caulking- $348,400
• Glass and glazing- $300,000
• Tile- $750,000
• Acoustical ceilings- $150,000
• Terrazzo- $3,000,000
• Resilient flooring- $335,000
• Painting- $420,000
• Elevators- $964,000
• Plumbing- $1,619,000
• HVAC- $15,000,000
• Electrical- $10,150,000
|