| Bid Info Links |
PlanHolders
Bid Info
Sub Bid Info
|
| Scope of Work |
The scope of work shall include HVAC upgrades and Fire Protection improvements to Building 56. Systems will include heating, air conditioning and ventilation, automatic temperature controls, plumbing systems, sprinkler systems, fire alarm system, high and low voltage electrical systems and natural gas piping. The consultant may also provide assistance with the Authority’s implementation of Energy Efficiency Initiatives including, demand control ventilation and HVAC retro-commissioning. Services shall include but shall not be limited to conceptual or schematic drawings and outline specifications, existing conditions assessment, design development or construction drawings and specifications, construction services, resident inspection services, cost estimates and analyses, investigations, reports, value engineering, and energy audits. Abatement of hazardous or contaminated materials is not included in the scope of work for this agreement.
The new work will be comprised of a) replacement of two (2) oil-fired, dual fuel HW boilers with new HE natural gas-fired condensing boilers; b) replacement of three (3) existing, constant volume, split system A/C units with three (3) new variable air volume A/C units; c) new building HVAC controls; d) install new air distribution system including VAV boxes and fan-powered boxes; and d) install new natural gas piping from meter to boilers; e) replace existing sprinkler system and upgrade fire alarm. The existing building is comprised of approximately 56,000 s.f. cargo area and 14,000 s.f. office spaces. Work will require SIDA access.
|