T173
|
Construction Opportunity:
Architectural Lighting, Electrical and Communicati, Tobin Bridge |
Anticipated Advertised:
10/09/08
|
Estimate:
$2,700,000
|
Details
|
 |
|
L613
|
Construction Opportunity:
Logan Airport Wayfinding System, Logan Airport |
Anticipated Advertised:
10/09/08
|
Estimate:
$15,000,000
|
Details
|
 |
|
L166
|
Professional Opportunity:
Runway-End 33L & 22R Safety Improvements, Logan Airport |
Anticipated Advertised:
10/09/08
|
Estimate:
$14,000,000
|
Details
|
 |
|
A197
|
Professional Opportunity:
Asset Inventory & Maintenance Management System, Agency Wide |
Anticipated Advertised:
10/09/08
|
Estimate:
$6,125,000
|
Details
|
 |
|
M340
|
Construction Opportunity:
Rehab E.B. Sailing Center Float, Maritime |
Anticipated Advertised:
10/16/08
|
Estimate:
$280,000
|
Details
|
 |
|
D161
|
Construction Opportunity:
So. Boston Signage-Design & Implementation, Maritime |
Anticipated Advertised:
10/16/08
|
Estimate:
$620,000
|
Details
|
 |
|
T152
|
Construction Opportunity:
Air Condition Admin Offices & Comp. Room, Tobin Bridge |
Anticipated Advertised:
10/23/08
|
Estimate:
$650,000
|
Details
|
 |
|
L706
|
Construction Opportunity:
Stortz Connection - Terminal B, Logan Airport |
Anticipated Advertised:
11/06/08
|
Estimate:
$300,000
|
Details
|
 |
|
A113
|
Construction Opportunity:
ADA Compliance Implementation, Agency Wide |
Anticipated Advertised:
11/06/08
|
Estimate:
$3,630,000
|
Details
|
 |
|
L866
|
Construction Opportunity:
Runway Status Lights, Logan Airport |
Anticipated Advertised:
11/13/08
|
Estimate:
$1,000,000
|
Details
|
 |
|
H190
|
Construction Opportunity:
CAT Roof & Building Renovations, Hanscom Airfield |
Anticipated Advertised:
11/13/08
|
Estimate:
$330,000
|
Details
|
 |
|
L513
|
Construction Opportunity:
Terminal B & C Restroom Renovations, Logan Airport |
Anticipated Advertised:
11/20/08
|
Estimate:
$3,050,000
|
Details
|
 |
|
L959
|
Construction Opportunity:
BIF Sewer Lift Station, Logan Airport |
Anticipated Advertised:
11/27/08
|
Estimate:
$400,000
|
Details
|
 |
|
L954
|
Construction Opportunity:
Replace Terminal E BHS Carousels, Logan Airport |
Anticipated Advertised:
11/27/08
|
Estimate:
$3,900,000
|
Details
|
 |
|
L1008
|
Construction Opportunity:
Board Room Technology Upgrade, Logan Airport |
Anticipated Advertised:
11/27/08
|
Estimate:
$150,000
|
Details
|
 |
|
M217
|
Construction Opportunity:
Conley Terminal Crane Modernization, Maritime |
Anticipated Advertised:
12/04/08
|
Estimate:
$10,700,000
|
Details
|
 |
|
L962
|
Construction Opportunity:
Chiller Replacement-CHP, Logan Airport |
Anticipated Advertised:
12/26/08
|
Estimate:
$1,000,000
|
Details
|
 |
|
T163
|
Construction Opportunity:
Structural Steel Painting, Phases 3 & 8, Tobin Bridge |
Anticipated Advertised:
01/08/09
|
Estimate:
$14,000,000
|
Details
|
 |
|
M188
|
Construction Opportunity:
Site Improvements - Massport Overlook at Castle Is, Maritime |
Anticipated Advertised:
01/08/09
|
Estimate:
$353,000
|
Details
|
 |
|
L775
|
Construction Opportunity:
Terminals B, C & E HVAC Equipment Replacement, Logan Airport |
Anticipated Advertised:
01/08/09
|
Estimate:
$12,945,000
|
Details
|
 |
|
L747
|
Construction Opportunity:
Delta Taxiway Extension, Logan Airport |
Anticipated Advertised:
01/08/09
|
Estimate:
$13,326,000
|
Details
|
 |
|
L684
|
Construction Opportunity:
Carpet Replacement - MPA Offices - LOC, Logan Airport |
Anticipated Advertised:
01/09/09
|
Estimate:
$600,000
|
Details
|
 |
|
L1011
|
Construction Opportunity:
Biometric Readers at Security Checkpoints, Logan Airport |
Anticipated Advertised:
01/22/09
|
Estimate:
$300,000
|
Details
|
 |
|
H221
|
Construction Opportunity:
Virginia Road Fence, Hanscom Airfield |
Anticipated Advertised:
02/05/09
|
Estimate:
$100,000
|
Details
|
 |
|
H218
|
Construction Opportunity:
Access Control System Upgrade, Hanscom Airfield |
Anticipated Advertised:
02/05/09
|
Estimate:
$405,000
|
Details
|
 |
|
H214
|
Construction Opportunity:
Reconstruct Taxiways W & M, Hanscom Airfield |
Anticipated Advertised:
02/05/09
|
Estimate:
$1,980,000
|
Details
|
 |
|
H212
|
Construction Opportunity:
Security Fence, Hanscom Airfield |
Anticipated Advertised:
02/05/09
|
Estimate:
$510,000
|
Details
|
 |
|
L982
|
Construction Opportunity:
Term. E Auto. Aircraft Docking Sys., Logan Airport |
Anticipated Advertised:
02/19/09
|
Estimate:
$500,000
|
Details
|
 |
|
L961
|
Construction Opportunity:
Boiler Replacement, Logan Airport |
Anticipated Advertised:
02/19/09
|
Estimate:
$650,000
|
Details
|
 |
|
L957
|
Construction Opportunity:
Domestic Booster Pump - North Tower, Logan Airport |
Anticipated Advertised:
02/26/09
|
Estimate:
$75,000
|
Details
|
 |
|
L929
|
Construction Opportunity:
Fire Protection Upgrade - Delta & American Hangars, Logan Airport |
Anticipated Advertised:
03/03/09
|
Estimate:
$1,000,000
|
Details
|
 |
|
T185
|
Professional Opportunity:
FY10-12 On-Call Design & Construction, Tobin Bridge |
Anticipated Advertised:
03/05/09
|
Estimate:
$600,000
|
Details
|
 |
|
M364
|
Construction Opportunity:
Waterfront Structural Repairs, Maritime |
Anticipated Advertised:
04/30/09
|
Estimate:
$1,000,000
|
Details
|
 |
|
L713
|
Construction Opportunity:
Logan Admin. Bldg. Level 6 Renov., Logan Airport |
Anticipated Advertised:
04/30/09
|
Estimate:
$900,000
|
Details
|
 |
|
L804
|
Construction Opportunity:
Taxi/Limo Pool Upgrade, Logan Airport |
Anticipated Advertised:
06/04/09
|
Estimate:
$2,000,000
|
Details
|
 |
|
L727
|
Construction Opportunity:
Replacement of Marine 1, Logan Airport |
Anticipated Advertised:
06/11/09
|
Estimate:
$6,000,000
|
Details
|
 |
|
M360
|
Construction Opportunity:
Coastal Oil Improvements for Refers/Empties, Maritime |
Anticipated Advertised:
06/25/09
|
Estimate:
$5,000,000
|
Details
|
 |
|
L582
|
Construction Opportunity:
Rehab. R/W9-27 & Delta T/W, Logan Airport |
Anticipated Advertised:
06/25/09
|
Estimate:
$12,000,000
|
Details
|
 |
|
A223
|
Construction Opportunity:
Fiber Network Completion, Agency Wide |
Anticipated Advertised:
07/02/09
|
Estimate:
$1,100,000
|
Details
|
 |
|
L829
|
Professional Opportunity:
Sanitary/Storm System Rehab., Logan Airport |
Anticipated Advertised:
07/07/09
|
Estimate:
$1,000,000
|
Details
|
 |
|
L599
|
Professional Opportunity:
Elevator/Escalator Upgrade - Phase 2, Logan Airport |
Anticipated Advertised:
07/07/09
|
Estimate:
$11,500,000
|
Details
|
 |
|
L990
|
Professional Opportunity:
Interior Common Area Improvements - Term. B, Logan Airport |
Anticipated Advertised:
07/09/09
|
Estimate:
$5,500,000
|
Details
|
 |
|
L981
|
Professional Opportunity:
Renovation of Communication Center T-16, Logan Airport |
Anticipated Advertised:
07/09/09
|
Estimate:
$2,800,000
|
Details
|
 |
|
L892
|
Professional Opportunity:
Substation Replacement - Terminal E, Logan Airport |
Anticipated Advertised:
07/09/09
|
Estimate:
$15,000,000
|
Details
|
 |
|
L832
|
Professional Opportunity:
Terminal B Fire Suppression System, Logan Airport |
Anticipated Advertised:
07/09/09
|
Estimate:
$2,000,000
|
Details
|
 |
|
M320
|
Construction Opportunity:
Berth 14 Structural Repair, Maritime |
Anticipated Advertised:
07/23/09
|
Estimate:
$2,000,000
|
Details
|
 |
|
L970
|
Construction Opportunity:
PA System Upgrade - Term. B & C, Logan Airport |
Anticipated Advertised:
07/23/09
|
Estimate:
$2,000,000
|
Details
|
 |
|
L949
|
Professional Opportunity:
Bus Maintenance Facility & CNG Station, Logan Airport |
Anticipated Advertised:
07/23/09
|
Estimate:
$19,960,000
|
Details
|
 |
|
T160
|
Professional Opportunity:
Deck Rehabilitation, Phase VII, Tobin Bridge |
Anticipated Advertised:
09/03/09
|
Estimate:
$14,000,000
|
Details
|
 |
|
L784
|
Construction Opportunity:
Water Main Valve & Hydrant Replacement, Logan Airport |
Anticipated Advertised:
09/03/09
|
Estimate:
$1,348,000
|
Details
|
 |
|
L817
|
Construction Opportunity:
Substation System Assessment & Replacement, Logan Airport |
Anticipated Advertised:
09/11/09
|
Estimate:
$1,500,000
|
Details
|
 |
|
H216
|
Construction Opportunity:
Overlay Taxiway H & Runway 5 Overrun, Hanscom Airfield |
Anticipated Advertised:
09/24/09
|
Estimate:
$1,480,000
|
Details
|
 |
|
L910
|
Construction Opportunity:
ASDE-X MPA Remote Displays, Data, Tracking, Logan Airport |
Anticipated Advertised:
10/22/09
|
Estimate:
$1,800,000
|
Details
|
 |
|
L818
|
Construction Opportunity:
Cargo Building Access Control, Logan Airport |
Anticipated Advertised:
10/29/09
|
Estimate:
$3,000,000
|
Details
|
 |
|
H201
|
Construction Opportunity:
Rehabilitate Taxiway H, Hanscom Airfield |
Anticipated Advertised:
11/26/09
|
Estimate:
$1,000,000
|
Details
|
 |
|
L269
|
Professional Opportunity:
Consolidated Rental Car Facility, Logan Airport |
Anticipated Advertised:
01/07/10
|
Estimate:
$453,241,000
|
Details
|
 |
|
A237
|
Professional Opportunity:
GIS Aerial Photogrammetry - FY11, Agency Wide |
Anticipated Advertised:
01/07/10
|
Estimate:
$1,125,000
|
Details
|
 |
|
A216
|
Construction Opportunity:
Consolidated Camera Surveillance System, Agency Wide |
Anticipated Advertised:
01/07/10
|
Estimate:
$6,000,000
|
Details
|
 |
|
M358
|
Construction Opportunity:
Electrical Infrastructure Modernization & Exp., Maritime |
Anticipated Advertised:
01/21/10
|
Estimate:
$2,000,000
|
Details
|
 |
|
L166
|
Construction Opportunity:
Runway-End 33L & 22R Safety Improvements, Logan Airport |
Anticipated Advertised:
01/21/10
|
Estimate:
$14,000,000
|
Details
|
 |
|
T185
|
Construction Opportunity:
FY10-12 On-Call Design & Construction, Tobin Bridge |
Anticipated Advertised:
02/04/10
|
Estimate:
$600,000
|
Details
|
 |
|
L850
|
Professional Opportunity:
Cogeneration Facility, Logan Airport |
Anticipated Advertised:
03/04/10
|
Estimate:
$40,000,000
|
Details
|
 |
|
L1021
|
Construction Opportunity:
Roadway Resurfacing, Logan Airport |
Anticipated Advertised:
03/04/10
|
Estimate:
$1,000,000
|
Details
|
 |
|
L1014
|
Construction Opportunity:
R/W 4R & 33L Light Pier Rehab, Logan Airport |
Anticipated Advertised:
04/29/10
|
Estimate:
$200,000
|
Details
|
 |
|
L491
|
Professional Opportunity:
NSA Airport Edge Buffer, Logan Airport |
Anticipated Advertised:
05/06/10
|
Estimate:
$515,000
|
Details
|
 |
|
L1020
|
Construction Opportunity:
Enhanced Logan Landscaping, Logan Airport |
Anticipated Advertised:
05/06/10
|
Estimate:
$500,000
|
Details
|
 |
|
L829
|
Construction Opportunity:
Sanitary/Storm System Rehab., Logan Airport |
Anticipated Advertised:
06/08/10
|
Estimate:
$1,000,000
|
Details
|
 |
|
L599
|
Construction Opportunity:
Elevator/Escalator Upgrade - Phase 2, Logan Airport |
Anticipated Advertised:
06/08/10
|
Estimate:
$11,500,000
|
Details
|
 |
|
L990
|
Construction Opportunity:
Interior Common Area Improvements - Term. B, Logan Airport |
Anticipated Advertised:
06/10/10
|
Estimate:
$5,500,000
|
Details
|
 |
|
L981
|
Construction Opportunity:
Renovation of Communication Center T-16, Logan Airport |
Anticipated Advertised:
06/10/10
|
Estimate:
$2,800,000
|
Details
|
 |
|
L892
|
Construction Opportunity:
Substation Replacement - Terminal E, Logan Airport |
Anticipated Advertised:
06/10/10
|
Estimate:
$15,000,000
|
Details
|
 |
|
L832
|
Construction Opportunity:
Terminal B Fire Suppression System, Logan Airport |
Anticipated Advertised:
06/10/10
|
Estimate:
$2,000,000
|
Details
|
 |
|
L858
|
Construction Opportunity:
Boutwell Computer Room HVAC, Logan Airport |
Anticipated Advertised:
07/01/10
|
Estimate:
$2,000,000
|
Details
|
 |
|
M338
|
Construction Opportunity:
S. Boston Signage Design & Implementation - Ph. 2, Maritime |
Anticipated Advertised:
07/08/10
|
Estimate:
$1,500,000
|
Details
|
 |
|
L1018
|
Construction Opportunity:
Terminal B, C & E HVAC Equipment - Phase 1B, Logan Airport |
Anticipated Advertised:
07/08/10
|
Estimate:
$6,870,000
|
Details
|
 |
|
L1002
|
Professional Opportunity:
Terminal B to C Connector Corridor, Logan Airport |
Anticipated Advertised:
07/08/10
|
Estimate:
$14,000,000
|
Details
|
 |
|
M288
|
Construction Opportunity:
Maintenance Facility - South Boston, Maritime |
Anticipated Advertised:
07/22/10
|
Estimate:
$770,000
|
Details
|
 |
|
T160
|
Construction Opportunity:
Deck Rehabilitation, Phase VII, Tobin Bridge |
Anticipated Advertised:
08/05/10
|
Estimate:
$14,000,000
|
Details
|
 |
|
H198
|
Construction Opportunity:
Rehab Taxiway M, Hanscom Airfield |
Anticipated Advertised:
08/26/10
|
Estimate:
$1,000,000
|
Details
|
 |
|
L795
|
Professional Opportunity:
Centerline Lights on Taxiway A, Logan Airport |
Anticipated Advertised:
09/07/10
|
Estimate:
$1,500,000
|
Details
|
 |
|
L947
|
Professional Opportunity:
EOC Upgrade, Logan Airport |
Anticipated Advertised:
09/09/10
|
Estimate:
$2,500,000
|
Details
|
 |
|
L203
|
Professional Opportunity:
American Airlines Hangar Renovations, Logan Airport |
Anticipated Advertised:
09/09/10
|
Estimate:
$4,500,000
|
Details
|
 |
|
H220
|
Construction Opportunity:
Pine Hill T-Hangar Roof Repair, Hanscom Airfield |
Anticipated Advertised:
10/21/10
|
Estimate:
$400,000
|
Details
|
 |
|
H219
|
Construction Opportunity:
Rehab Old T-Hangar Pavement, Hanscom Airfield |
Anticipated Advertised:
10/21/10
|
Estimate:
$1,095,000
|
Details
|
 |
|
H155
|
Construction Opportunity:
Airfield Perimeter Road Improvements, Hanscom Airfield |
Anticipated Advertised:
11/25/10
|
Estimate:
$350,000
|
Details
|
 |
|
L949
|
Construction Opportunity:
Bus Maintenance Facility & CNG Station, Logan Airport |
Anticipated Advertised:
01/06/11
|
Estimate:
$19,960,000
|
Details
|
 |
|
L489
|
Professional Opportunity:
SWSA Airport Edge Buffer - Phase 2, Logan Airport |
Anticipated Advertised:
01/06/11
|
Estimate:
$6,100,000
|
Details
|
 |
|
L799
|
Construction Opportunity:
T/W Turn Improvements, Logan Airport |
Anticipated Advertised:
01/20/11
|
Estimate:
$2,000,000
|
Details
|
 |
|
L199
|
Construction Opportunity:
Resurface North Cargo Apron, Logan Airport |
Anticipated Advertised:
01/20/11
|
Estimate:
$10,560,000
|
Details
|
 |
|
L491
|
Construction Opportunity:
NSA Airport Edge Buffer, Logan Airport |
Anticipated Advertised:
02/03/11
|
Estimate:
$515,000
|
Details
|
 |
|
T180
|
Construction Opportunity:
Overlay Everett Ave. Roadway, Tobin Bridge |
Anticipated Advertised:
02/10/11
|
Estimate:
$720,000
|
Details
|
 |
|
L985
|
Construction Opportunity:
New Booth/Renov. - Term C Information Booth, Logan Airport |
Anticipated Advertised:
02/24/11
|
Estimate:
$125,000
|
Details
|
 |
|
H209
|
Construction Opportunity:
Rehab Roadway Areas, Hanscom Airfield |
Anticipated Advertised:
02/24/11
|
Estimate:
$200,000
|
Details
|
 |
|
M183
|
Professional Opportunity:
Expand Marine Building - Berth 11, Maritime |
Anticipated Advertised:
03/03/11
|
Estimate:
$3,000,000
|
Details
|
 |
|
L792
|
Construction Opportunity:
Terminal C Departures Level Finishes, Logan Airport |
Anticipated Advertised:
04/21/11
|
Estimate:
$1,500,000
|
Details
|
 |
|
L947
|
Construction Opportunity:
EOC Upgrade, Logan Airport |
Anticipated Advertised:
06/09/11
|
Estimate:
$2,500,000
|
Details
|
 |
|
L1002
|
Construction Opportunity:
Terminal B to C Connector Corridor, Logan Airport |
Anticipated Advertised:
06/09/11
|
Estimate:
$14,000,000
|
Details
|
 |
|
L852
|
Construction Opportunity:
West Outfall Pumps, Logan Airport |
Anticipated Advertised:
06/23/11
|
Estimate:
$1,000,000
|
Details
|
 |
|
L965
|
Professional Opportunity:
Comfort Control Network Upgrade, Logan Airport |
Anticipated Advertised:
07/07/11
|
Estimate:
$5,000,000
|
Details
|
 |
|
L203
|
Construction Opportunity:
American Airlines Hangar Renovations, Logan Airport |
Anticipated Advertised:
08/11/11
|
Estimate:
$4,500,000
|
Details
|
 |
|
L583
|
Construction Opportunity:
Rehab. R/W 33L & T/W C, Logan Airport |
Anticipated Advertised:
09/22/11
|
Estimate:
$15,840,000
|
Details
|
 |
|
H223
|
Construction Opportunity:
Heavy Equipment Cold Storage, Hanscom Airfield |
Anticipated Advertised:
11/24/11
|
Estimate:
$1,015,000
|
Details
|
 |
|
L489
|
Construction Opportunity:
SWSA Airport Edge Buffer - Phase 2, Logan Airport |
Anticipated Advertised:
12/08/11
|
Estimate:
$6,100,000
|
Details
|
 |
|
L920
|
Construction Opportunity:
Mill and Inlay Taxiways Q, F, C & P, Logan Airport |
Anticipated Advertised:
12/22/11
|
Estimate:
$4,371,000
|
Details
|
 |
|
L850
|
Construction Opportunity:
Cogeneration Facility, Logan Airport |
Anticipated Advertised:
01/26/12
|
Estimate:
$40,000,000
|
Details
|
 |
|
M183
|
Construction Opportunity:
Expand Marine Building - Berth 11, Maritime |
Anticipated Advertised:
02/02/12
|
Estimate:
$3,000,000
|
Details
|
 |
|
L795
|
Construction Opportunity:
Centerline Lights on Taxiway A, Logan Airport |
Anticipated Advertised:
02/07/12
|
Estimate:
$1,500,000
|
Details
|
 |
|
L665
|
Construction Opportunity:
Runway Circuit Segmentation, Logan Airport |
Anticipated Advertised:
03/22/12
|
Estimate:
$4,600,000
|
Details
|
 |
|
L984
|
Construction Opportunity:
Terminal A Underpass, Logan Airport |
Anticipated Advertised:
05/24/12
|
Estimate:
$1,000,000
|
Details
|
 |
|
A259
|
Construction Opportunity:
Energy Efficiency Initiatives, Agency Wide |
Anticipated Advertised:
07/05/12
|
Estimate:
$1,000,000
|
|