Capital Programs

Capital Programs » L1319-C1

Trade Contracrators Framingham Garage
Contract: L1319-C1
Location: Framingham LEX
Documents:
L1319-C1 (20.3k) updated Thursday, May 15, 2014
L1319-C1 Responses to Trade Contractor RFQ Questions 5-27-14 (52.2k) updated Tuesday, May 27, 2014
L1319-C1 Attendance List (700.9k) updated Thursday, July 10, 2014
Responses to Questions L1319-C1 07-18-14 (224.2k) updated Friday, July 18, 2014
L1319-C1 Responses to Questions 07-22-2014 (115.4k) updated Tuesday, July 22, 2014
Responses to Questions L1319-C1 7-28-14 (310k) updated Monday, July 28, 2014
Opportunity Type Construction
Advertised Date 5/15/2014
Bid Date
Sub Bid Date
Qualification Due 6/12/2014 12:00 PM
Qualification Location Capital Programs Dept.,LOC, One Harborside Dr., East Boston, MA 02128
Pre-Bid Conference
5/29/2014
Bid Opening
Sub Bid Opening
Bid Info Links
PlanHolders
Sub Bid Info
Shortlisted
Scope of Work The construction of a new multi-story parking garage at the Logan Express Terminal in Framingham, Ma. The garage shall be a precast concrete structure consisting of a ground floor and three elevated levels. The completed facility shall have capacity for approximately 1100 vehicles. The garage shall include stairtowers and elevators for pedestrian circulation. Within the footprint of the garage, a new 7,000 square foot terminal building shall be constructed. The terminal building shall include office space for staff, Men’s and Women’s Rooms, passenger waiting area and space for a future concession. The terminal building shall be integrated into the elevator core. The estimated cost of the trade contractors’ portion of this phase of the Project is approximately $7,650,000 and the construction duration for this phase is approximately ten (10) months. The estimated value of work to be performed by trade contractors is as follows: Miscellaneous Metals………………………………$383,000 Acoustical Tile $175,000 Glass and Glazing $1,445,000 Tile $120,000 Painting $52,000 Elevators $414,000 Roofing and Flashing $34,000 Plumbing $ 1,190,000 Fire Protection Sprinkler System $153,000 Heating, Ventilating & Air Conditioning $300,000 Electrical $3,385,000
Contact CPBidQuestions@massport.com
Awarded To:
General Contractor
Contract Value  
Contract Awarded Date