15L-33R Runway Safety Area Improvements
Contract: L1064-C1
Location: Logan Airport
Documents:
L1064-C1 (17.3k) updated Thursday, February 20, 2014
L1064-C1 Responses to Questions (57.9k) updated Tuesday, March 18, 2014
Opportunity Type Construction
Advertised Date 2/20/2014
Bid Date 3/19/2014
Sub Bid Date
Qualification Due
Qualification Location
Pre-Bid Conference
3/6/2014
10:00 AM
Capital Programs Dept., Logan Office Center, One Harborside Drive, E. Boston, MA 02128
Bid Opening
3/19/2014
11:00 AM
Capital Programs Dept., Logan Office Center, One Harborside Drive, E. Boston, MA 02128
Sub Bid Opening
Bid Info Links
Sub Bid Info
Shortlisted
Scope of Work The work includes shifting the thresholds of runways 15l and 33r approximately 200 feet to the east, along with the relocation of the airport perimeter road at both runway ends. The work generally includes excavation and embankment, pavement removal, pavement milling, new full depth runway pavement construction, drainage improvements, new runway edge and threshold lighting, duct bank and conduit installation, pavement markings, top soiling and seeding
Contact CPBidQuestions@massport.com
Awarded To:
General Contractor McCourt Construction Co. Inc.
Contract Value $1,804,215